Jul 30, 2011

Studio East - Carmody Groake


Built within a live construction site, 35m atop Westfield Stratford City development, the pavilion provides the first views across London’s Olympic Stadium, and Zaha Hadid’s 2012 Aquatics Centre, forming a commanding presence on London’s skyline.
A fast build with a life span of just 3 weeks, the primary structure, weighing 70 tons, is constructed from hired materials borrowed from the existing construction site, including: 2000 scaffolding boards, 3500 scaffolding poles, and reclaimed timber, used to create the walls and floors of the 800 square metre dining space.
(to find out more..)




afterrabbit

No comments:

 

free hit counter

Creative Commons License
This work is licensed under a Creative Commons Attribution-Noncommercial 2.5 Malaysia License.

@2010 DeArasis. SOME RIGHTS RESERVED.